Timetable Assurance at Network Rail

Checking a timetable against the Timetable Planning Rules in the UK is at best a long-winded manual task, and at worst is just not feasible within a reasonable amount of time. Not anymore with ATTUne.
View Case Study

MOIRA2 Re-modelling – 2014/15

In the autumn of 2013, ATOC and the Department for Transport announced that they had concerns with the mathematical approach used within the MOIRA2 algorithm. From this date, Bellvedi have worked closely with both DfT and ATOC to discuss and understand the options to take forward this key product for the industry.
View Case Study

Moira calibration for ScotRail – 2014

As part of the a franchise bid for a GB rail operator, Bellvedi created post-processing spreadsheets to take the results of Moira and to adjust these results on a sound evidence base so they replicated historic train counts to an acceptable level and provided a sound basis for forecasting.
View Case Study